Our Experience.

Residential Repairs & Renovations

Photos

Photo 1 - Photo 2

Commercial & Industrial Service & Maintenance

IGA Bargara Photos

Photo 1 - Photo 2 - Photo 3

Boral Quarry Bundaberg

Photo 1 - Photo 2 - Photo 3

New Home Installations

Photos

Photo 1 - Photo 2 - Photo 3

Office & Shop Fitting

Office Fitout Southgate Endeavour Foundation

This was a fast turnaround fitout from Base Build, including power and lighting and Krone Cat5 to Cat6 specification data installation.

Photo

Architect: Ceccato Hall and Associates
Builder: Formula Interiors
Electrical Engineer: Electrical Design Group
Time Frame: 3 month project, completed in October 2006
Electrical Value: $198,000

Fitness First Wynnum

Another fast turnaround project from Base Build to specific Fitness First fitout requirements.  This projects included specialist lighting systems, C-BUS lighting control systems, Krone Cat 6 communications system, automatic door system for Gantner lockers, control wiring for ventilation systems, and upgraded the switchboards for the huge power requirements.

Photo 1 - Photo 2 - Photo 3 - Photo 4 - Photo 5 - Photo 6

Builder: Adco Constructions
Electrical Value: $194,000

Commercial Refurbishment & Fitout

Caboolture Sports Club

This architecturally designed Hospitality Refurbishment and Addition included switchboard installations, new kitchen and equipment upgrade, new bistro, wine bar area. Specialist neon and LED feature lighting, controlled by seven newly installed Dynalite control panels, upgraded power and data for poker machines and car park lighting. The Major challenge of the lengthy project included managing the four stages of works whilst maintaining the operational capabilities of this live site. As a testament to Pulse Electrical’s commitment to professional, reliable and fast service we now perform all the Club’s maintenance requirements.

Photo 1 - Photo 2 - Photo 3 - Photo 4 - Photo 5

Builder: Intero Projects
Architect: Brand & Slater
Electrical Engineer: DMA Engineering
Time Frame: 12 month project, completed in November 2006
Electrical Value: $384,000

Greenbank RSL

Another architecturally designed Major upgrade of core electrical services and addition of new bar and lounge areas.  The major challenge of this project was the installation and changeover of a new Dual 2500 amp Main switchboard with Integral Auto Transfer switch and Bus Tie System, whilst maintaining the continuous service of the Club.  Also included installation of specialist lighting control systems, Evacuation emergency lighting, generator submains relocation and progressive staging of works whilst new gaming machine area was being commissioned.

Photo 1 - Photo 2 - Photo 3 - Photo 4 - Photo 5 - Photo 6

Builder: Fardoulys Constructions
Architect: Brand & Slater
Electrical Engineer: DMA Engineers
Time Frame: 12 month project, completed in August 2006
Electrical Value: $430,000

Commercial Construction

Pioneer Gardens New Dementia Building and Aged Care Facility

These photos do not do justice to this major project involving the refurbishment of the left side of the hall and the right being new construction.  This project involved the installation of power and data, nurse call systems and emergency evacuation systems. The Facility was kept live throughout the duration of the project requiring strict operating and safety procedures to ensure the safety and comfort of patients.

Photo 1 - Photo 2

Bickerton Masters Architecture
Ashburner Francis Consulting Engineers
Builder: Carmichael Builders
Time Frame: 14 month project, estimated for completion September 2007
Electrical Value: $610,000

HillBrook School Chapel

This new construction of the prestigious Hillbrook School’s new Chapel was Architecturally designed out of the ground including light, power and data.  This was a well designed straightforward project completed will within time and budget.

Photo 1 - Photo 2 - Photo 3 - Photo 4 - Photo 5

Builder:  Mt Cotton Constructions
Architect: Brand & Slater
Electrical Engineer: Electrical Design Group
Timeframe: 5 month project, completed in March 2006
Electrical Value: $116,000

“The View” – Bargara

This 5 storey residential high rise is part way through.  Trent Christensen is preparing the top floor deck before concrete is poured, and working on the cable tray in the underground carpark.

Photo 1 - Photo 2

Builder: Snitzco
Time Frame: Due for completion in November 2007